 ====== Work plan ====== ====== Work plan ======
- 
  
 ===== Deadlines ===== ===== Deadlines =====
Line 6: Line 5:
   * 2020-03-05 Define the **Project Backlog** (what must be done and key deliverables - every member should preferably participate in every task), **Global Sprint Plan**, **Initial Sprint Plan** (which tasks should be included, who does what) and **Release Gantt Chart** of the project and insert them on the wiki (planning)   * 2020-03-05 Define the **Project Backlog** (what must be done and key deliverables - every member should preferably participate in every task), **Global Sprint Plan**, **Initial Sprint Plan** (which tasks should be included, who does what) and **Release Gantt Chart** of the project and insert them on the wiki (planning)
   * 2020-03-10 Upload the “black box” **System Diagrams** & **Structural Drafts** to the wiki   * 2020-03-10 Upload the “black box” **System Diagrams** & **Structural Drafts** to the wiki
-  * 2020-03-20 Upload the detailed **System Schematics Structural Drawings** to the wiki and do the **cardboard scale model** of the structure +  * 2020-03-27 Upload the detailed **System SchematicsStructural Drawings & 3D Modelation** to the wiki and do the **cardboard scale model** of the structure 
-  * 2020-03-25 Upload the **List of Materials (what & quantity)** to the wiki +  * 2020-04-01 Upload the **List of Materials (what & quantity)** to the wiki 
-  * 2020-03-27 Upload the **Interim Report and Presentation** to the wiki. The report must contain the the following chapters: Introduction, Project Management, State of the Art, Marketing Plan, Eco-efficiency Measures for Sustainability, Ethical and Deontological Concerns, Proposed Solution and Bibliography. In particular, the Project Management chapter includes the updated project progress register, the sprint report for completed sprints (tasks that were included, statuses, assignees, allocations) and the updated release Gantt chart  +  * 2020-04-08 Upload the **Interim Report and Presentation** to the wiki. The report must contain the the following chapters: Introduction, Project Management, State of the Art, Marketing Plan, Eco-efficiency Measures for Sustainability, Ethical and Deontological Concerns, Proposed Solution and Bibliography. In particular, the Project Management chapter includes the updated project progress register, the sprint report for completed sprints (tasks that were included, statuses, assignees, allocations) and the updated release Gantt chart  
-  * 2020-04-02 Interim Presentation, Discussion and Peer, Teacher and Supervisor Feedbacks +  * 2020-04-16 Interim Presentation, Discussion and Peer, Teacher and Supervisor Feedbacks 
-  * 2020-04-22 Complete the **List of Materials (local providers & price, including VAT and transportation)** to the wiki +  * 2020-04-23 Upload the **List of Materials (provider, price, quantity, including VAT and transportation)** to the wiki 
-  * 2020-05-29 Upload refined Interim Report (based on Teacher & Supervisor Feedbacks) +  * 2020-04-30 Upload the **Final video of the 3D Model** to the wiki  
-  * 2020-06-02 Upload the results of the **Functional Tests** to the wiki +  * 2020-05-06 Upload **Refined Interim Report (based on Teacher & Supervisor Feedbacks)** to the wiki 
-  * 2020-06-12 Upload the **Final Report, Presentation, Video, Paper, Poster and Manual**+  * 2020-05-13 Upload **Packaging solution** to the wiki 
 +  * 2020-06-02 Upload the results of the **(Prototype or Simulation) Functional Tests** to the wiki 
 +  * 2020-06-12 Upload the **Final Report, Presentation, Video, Paper, Poster and Manual** to the wiki
   * 2020-06-16 Final Presentation, Individual Discussion and Assessment   * 2020-06-16 Final Presentation, Individual Discussion and Assessment
-  * 2020-06-19:+  * 2020-06-22:
     - Update the wiki, report, paper with all suggested corrections     - Update the wiki, report, paper with all suggested corrections
-    - Hand in to the EPS coordinator+    - Upload to the OneDrive folders shared by epsatisep
-      - a **Pendrive with the refined deliverables (source + PDFtogether with all code and drawings produced** +      - Deliverables (pdf and others) 
-      - a **printed copy of the refined report and poster**+      - Code (Arduino code, Tinkercad/CoppeliaSim simulation code, mobile and Web app code) 
 +      - CAD (drawings and 3D model files) 
 +      - Videos (3D model simulation and final team video in mp4)
   * 2020-06-23:   * 2020-06-23:
-    - Hand in the **prototype and user manual** to the client+    - Play **final video** 
 +    - Play **music/landscapes** of your country
     - Receive the **EPS@ISEP certificate**     - Receive the **EPS@ISEP certificate**
-    - Bring **typical food** from your country 
- 
- 
 ===== Project Plan ===== ===== Project Plan =====
  
Line 53: Line 54:
 <caption>Project Backlog</caption> <caption>Project Backlog</caption>
 <WRAP box 400px center> <WRAP box 400px center>
-^ PBI       ^ Title          ^ Status     ^ +^ PBI       ^ Title                   ^ Status     ^ 
-| Z         Sample task    To do         +| Z         Drafts and structural drawings      In progress         
-| K         Sample task    To do            +| K         List of materials        In progress            
-| D         Sample task    To do         +| D         Create a name and a logo                In progress         
-| A         Sample task    To do         +| A         State of the art Almost done         
-| B         Sample task    To do         +| B         Uploading Gantt ChartIn progress         
-| E         Sample task    | To do      |    +| E         Interim Report          | To do      |    
-        | Sample task    | To do      |   +        | Design                  | To do      |  
 +| G         | Functional Tests        | To do      |   
 +| H         | Final report            | To do      |   
 +| I         | Presentation            | To do      |    
 </WRAP> </WRAP>
 </table> </table>
Line 69: Line 73:
 <table tlabel3> <table tlabel3>
 <caption>Sprint Plan</caption> <caption>Sprint Plan</caption>
-<WRAP box 400px center> +<WRAP box 800px center> 
-^ Sprint    ^ Task  ^  Duration (d) ^  Responsible ^ Involved   ^ +^ Sprint    ^ Task                    ^  Duration (d) ^  Responsible ^ Involved   ^ 
-| 1         Z     | 2             X and Y      | X, Y, Z, W |   +| 1         D State of the Art      | 2                          |  Team 
-        | K                 | Z            X, Y, Z, W |     +        | Z Global sprint plan                |               Team      |     
-        | D     | 1             W, Y and Z   X, Y, Z, W +        | Z Project Backlog       | 1                           Team      
-        | A     | 1             Y            X, Y, Z, W +        | Z Gantt Chart           | 1                           Team      
-        | B                 | Z and W      X, Y, Z, W |   +        | Z Global sprint plan                |               Team      |   
-        | E     | 4             X and W      X, Y, Z, W | +        | K Defining a clear idea | 4                           Team      |
-| 7         | C     | 2             | Y and Z      | X, Y, Z, W |+
 </WRAP> </WRAP>
 </table> </table>
Line 99: Line 102:
 </WRAP> </WRAP>
  
-Identify key project deliverables (when they will be started and completed) and build a release Gantt chartSee Figure {{ref>flabel1}} for inspiration.+ 
 +Current version of Gantt Chart. Gantt Chart was mainly made by using known deadlines. Figure {{ref>GanttChart}}. shows the construction of the Gantt Chart. 
 <WRAP centeralign> <WRAP centeralign>
-<figure flabel1+<figure GanttChart
-{{:{{:gantt_chart.png?600|}}|}} +{{:{{:gantt_chart.png?600|}} 
-<caption>Release Gantt chart</caption>+<caption>Gantt chart</caption>
 </figure> </figure>
 </WRAP> </WRAP>
  
  